Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example
Machine Hour Rate at 97% machine utilization factor: a worked example in contract manufacturing, job shop quoting & make-to-order
What does the result look like when machine utilization factor reaches 97%? The full calculation is worked below with real intermediate numbers. setting machine rates for routings, RFQs, and make-to-order production estimates
The inputs for this scenario
- Recoverable machine cost pool (annual): 96,000 $ (unchanged)
- Billable machine hours (annual): 780 machine hr (unchanged)
- Machine utilization factor: 97 % (raised for this scenario; the documented default is 84)
Working through the calculation
- Applying the documented formula (base machine-hour rate = recoverable machine cost pool รท billable machine hours) to the inputs above produces each figure below.
- At this operating point the engine returns 119 $ / machine hr for effective machine-hour rate after utilization, the number this scenario is built around.
- At this operating point the engine returns 123 $ / machine hr for raw throughput.
- At this operating point the engine returns 97 % for machine utilization factor.
- At this operating point the engine returns 780 hr for billable machine hours.
How this compares with the baseline
- Against the tool's baseline example, where machine utilization factor sits at 84% and the headline result is 103 $ / machine hr, this scenario comes in 15.48% above the baseline at 119 $ / machine hr.
- A figure at this level is achievable when machine utilization factor is genuinely sustained, not just peaked for a shift. It assumes a single blended cost pool and one utilization factor, so a cell mixing a high-cost 5-axis machine with cheaper supporting equipment needs separate rates rather than one averaged number.
Results at a glance
- effective machine-hour rate after utilization: 119 $ / machine hr (headline result)
- Raw throughput: 123 $ / machine hr
- machine utilization factor: 97 %
- billable machine hours: 780 hr
Run it with your numbers
- Every input above is editable in the live Machine Hour Rate calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.