Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example
Make-to-Order Lead Time at 21% queue, setup, inspection, and handoff allowance: a worked example
This scenario runs the make-to-order lead time calculation on the strong side: 21% queue, setup, inspection, and handoff allowance, with every other input held at its documented default. promising due dates for customer-specific jobs before releasing the order
The inputs for this scenario
- routing operation count for the order: 32 operations (unchanged)
- routing completion pace: 1.8 operations / hr (unchanged)
- queue, setup, inspection, and handoff allowance: 21 % (raised for this scenario; the documented default is 18)
Working through the calculation
- Applying the documented formula (base routing lead time = routing operation count for the order รท routing completion pace) to the inputs above produces each figure below.
- At this operating point the engine returns 21.51 hr for required make-to-order lead time, the number this scenario is built around.
- At this operating point the engine returns 17.78 hr for base routing lead time.
- At this operating point the engine returns 21 % for lead-time allowance applied.
- At this operating point the engine returns 1.8 operations / hr for routing completion pace.
How this compares with the baseline
- Against the tool's baseline example, where queue, setup, inspection, and handoff allowance sits at 18% and the headline result is 20.98 hr, this scenario comes in 2.54% above the baseline at 21.51 hr.
- Use it when quoting turnaround on a make-to-order job or sizing a routing's lead-time offset for scheduling. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- required make-to-order lead time: 21.51 hr (headline result)
- base routing lead time: 17.78 hr
- lead-time allowance applied: 21 %
- routing completion pace: 1.8 operations / hr
Run it with your numbers
- Every input above is editable in the live Make-to-Order Lead Time calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.