Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example
Quote Accuracy Score at 99% target quote accuracy rate: a worked example in contract manufacturing, job shop quoting & make-to-order
What does the result look like when target quote accuracy rate reaches 99%? The full calculation is worked below with real intermediate numbers. reviewing estimator performance, routing standards, and closed-job variance
The inputs for this scenario
- Jobs that landed within cost or margin tolerance: 84 quotes (unchanged)
- Closed quoted jobs reviewed in the period: 105 jobs (unchanged)
- Target quote accuracy rate: 99 % (raised for this scenario; the documented default is 90)
Working through the calculation
- Applying the documented formula (quote accuracy rate = quotes within cost or margin tolerance ÷ closed quoted jobs reviewed × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 80 % for quote accuracy rate, the number this scenario is built around.
- At this operating point the engine returns 19 points for quote accuracy gap to target.
- At this operating point the engine returns 84 count for quotes within cost or margin tolerance.
- At this operating point the engine returns 105 count for closed quoted jobs reviewed.
How this compares with the baseline
- Against the tool's baseline example, where target quote accuracy rate sits at 90% and the headline result is 80 %, this scenario lands almost exactly on the baseline at 80 %.
- A figure at this level is achievable when target quote accuracy rate is genuinely sustained, not just peaked for a shift. It treats every job equally, so a shop with a high count but most misses on its largest jobs can show a healthy rate while losing real money; weight by job value for a dollar-true picture.
Results at a glance
- quote accuracy rate: 80 % (headline result)
- quote accuracy gap to target: 19 points
- quotes within cost or margin tolerance: 84 count
- closed quoted jobs reviewed: 105 count
Run it with your numbers
- Every input above is editable in the live Quote Accuracy Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.