Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example

Shop Rate Calculator at 63% billable utilization factor: a worked example

This worked example runs the shop rate calculator numbers for a tougher week than the baseline: 63% billable utilization factor instead of the typical 88%. Calculate a blended shop rate from recoverable shop dollars and billable hours.

The inputs for this scenario

  • recoverable shop cost pool: 168,000 $ (held at the documented default)
  • billable production hours: 1,320 hr (held at the documented default)
  • billable utilization factor: 63 % (the input this scenario stresses; the baseline uses 88)

Working through the calculation

  • The calculation starts from the formula this tool documents: base shop rate = recoverable shop cost pool รท billable production hours.
  • effective shop rate after utilization works out to 80.18 $ / hr at these inputs, and this is the headline figure for the scenario.
  • Raw throughput works out to 127 $ / hr at these inputs.
  • billable utilization factor works out to 63 % at these inputs.
  • billable production hours works out to 1,320 hr at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where billable utilization factor sits at 88% and the headline result is 112 $ / hr, this scenario comes in 28.41% below the baseline at 80.18 $ / hr.
  • Use it when setting or revising standard hourly rates, before a quoting season, or after a major change in cost structure or volume. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • effective shop rate after utilization: 80.18 $ / hr (headline result)
  • Raw throughput: 127 $ / hr
  • billable utilization factor: 63 %
  • billable production hours: 1,320 hr

Run it with your numbers

  • To rerun this with your own numbers, open the live Shop Rate Calculator calculator, set billable utilization factor to your actual value, and adjust the remaining inputs to match your operation.