Contract Manufacturing, Job Shop Quoting & Make-to-Order worked example
Supplier Quote Comparison at 110% share of volume on a true like-for-like quote: a worked example
This scenario runs the supplier quote comparison calculation on the strong side: 110% share of volume on a true like-for-like quote, with every other input held at its documented default. choosing between supplier quotes for material, components, tooling, or outside services
The inputs for this scenario
- Per-unit price gap between supplier quotes: 2.85 $ / unit (unchanged)
- Annual buy quantity affected by the switch: 4,200 units (unchanged)
- Share of volume on a true like-for-like quote: 110 % (raised for this scenario; the documented default is 100)
- Confidence the quoted price will hold: 95 % (unchanged)
Working through the calculation
- Applying the documented formula (gross supplier quote impact = supplier quote cost difference per unit × affected buy quantity) to the inputs above produces each figure below.
- At this operating point the engine returns 12,509 $ for comparable supplier quote impact, the number this scenario is built around.
- At this operating point the engine returns 11,970 $ for gross supplier quote impact.
- At this operating point the engine returns -1,197 $ for supplier quote impact outside comparable scope.
- At this operating point the engine returns 658 $ for supplier quote impact at risk from confidence.
How this compares with the baseline
- Against the tool's baseline example, where share of volume on a true like-for-like quote sits at 100% and the headline result is 11,372 $, this scenario comes in 10% above the baseline at 12,509 $.
- Use it during a quote bake-off or resourcing decision when two vendors are within a few dollars per unit and you need to know whether the gap is material after risk. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- comparable supplier quote impact: 12,509 $ (headline result)
- gross supplier quote impact: 11,970 $
- supplier quote impact outside comparable scope: -1,197 $
- supplier quote impact at risk from confidence: 658 $
Run it with your numbers
- Every input above is editable in the live Supplier Quote Comparison calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.