Safety & Workforce calculator

Contractor Safety Score Calculator

Score contractor safety from TRIR, training, and audit factors. Score severity, occurrence, and detection to get a single weighted risk number for ranking.

What this calculator does

  • Score contractor safety from TRIR, training, and audit factors.
  • Use it when contractor safety in safety and workforce needs a defensible ranking against other safety and workforce risks for the next review.
  • Turns severity factor, occurrence factor, detection factor into a risk score for contractor safety in safety and workforce.

Formula used

  • Weighted score = severity × 0.40 + occurrence × 0.35 + detection × 0.25

Inputs explained

  • Severity factor: undefined
  • Occurrence factor: undefined
  • Detection factor: undefined

How to use the result

  • Use it when contractor safety in safety and workforce is going through an FMEA or hazard review.
  • Scores are subjective. Use them to rank, not to claim absolute risk.

Common questions

  • What problem does this contractor safety calculator solve? Score contractor safety from TRIR, training, and audit factors. You get a risk score you can defend before quoting, scheduling, or sign-off.
  • Where do I get the inputs for this safety and workforce calculator? severity factor, occurrence factor, detection factor usually move the risk score most. Pull from measured safety and workforce runs, supplier data, and recent quotes rather than memory.
  • What do I do with this number? Use the score to rank against other safety and workforce risks. Treat it as a sort key, not an absolute number.
  • What should I verify first? Validate scoring with a second person; scores are subjective and drift between reviewers.

Last reviewed 2026-05-12.