Data Center & Infrastructure Equipment Manufacturing worked example
Cooling Coil Cost at 58% coil package scope included: a worked example
This worked example runs the cooling coil cost numbers for a tougher week than the baseline: 58% coil package scope included instead of the typical 80%. Estimate configured coil cost for CRAC, CRAH, dry cooler, heat exchanger, or liquid-cooling equipment builds.
The inputs for this scenario
- Cooling coils or heat exchangers in build: 100 coils (held at the documented default)
- Configured cost per coil: 45 $ / coil (held at the documented default)
- Coil package scope included: 58 % (the input this scenario stresses; the baseline uses 80)
- Fixed coil engineering and test cost: 250 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Configured coil cost = cooling coils or heat exchangers × configured cost per coil × coil package scope included.
- Total cooling coil cost works out to 2,860 $ at these inputs, and this is the headline figure for the scenario.
- Cost per cooling coil works out to 28.6 $ / piece at these inputs.
- Configured coil cost works out to 2,610 $ at these inputs.
- Fixed coil engineering and test cost works out to 250 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where coil package scope included sits at 80% and the headline result is 3,850 $, this scenario comes in 25.71% below the baseline at 2,860 $.
- Use it when quoting a coil or heat exchanger package, deciding how much of the assembly to insource, or breaking out variable from fixed cost on a thermal build. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total cooling coil cost: 2,860 $ (headline result)
- Cost per cooling coil: 28.6 $ / piece
- Configured coil cost: 2,610 $
- Fixed coil engineering and test cost: 250 $
Run it with your numbers
- To rerun this with your own numbers, open the live Cooling Coil Cost calculator, set coil package scope included to your actual value, and adjust the remaining inputs to match your operation.