Defense Electronics & Ruggedized Systems worked example
Mission-Critical Quality Cost at 58% program exposure included: a worked example
This worked example runs the mission-critical quality cost numbers for a tougher week than the baseline: 58% program exposure included instead of the typical 80%. Estimate quality cost tied to defense electronics inspection, failure containment, MRB, rework, retest, scrap, and customer escapes.
The inputs for this scenario
- Quality events or affected assemblies: 100 events (held at the documented default)
- Cost per quality event: 45 $ / event (held at the documented default)
- Program exposure included: 58 % (the input this scenario stresses; the baseline uses 80)
- Fixed containment and MRB cost: 250 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Exposed quality event cost = quality events or affected assemblies × cost per quality event × program exposure included.
- Total mission-critical quality cost works out to 2,860 $ at these inputs, and this is the headline figure for the scenario.
- Quality cost per event works out to 28.6 $ / piece at these inputs.
- Exposed quality event cost works out to 2,610 $ at these inputs.
- Fixed containment and MRB cost works out to 250 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where program exposure included sits at 80% and the headline result is 3,850 $, this scenario comes in 25.71% below the baseline at 2,860 $.
- Use it when building a cost-of-poor-quality case, sizing quality reserves, or prioritizing corrective actions on a defense electronics program. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total mission-critical quality cost: 2,860 $ (headline result)
- Quality cost per event: 28.6 $ / piece
- Exposed quality event cost: 2,610 $
- Fixed containment and MRB cost: 250 $
Run it with your numbers
- To rerun this with your own numbers, open the live Mission-Critical Quality Cost calculator, set program exposure included to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.