Dental, Orthodontic & Prosthetics Manufacturing worked example
Quality Inspection Load at 7.2% hold, recheck, and documentation allowance: a worked example
This worked example runs the quality inspection load numbers for a tougher week than the baseline: 7.2% hold, recheck, and documentation allowance instead of the typical 10%. Estimate inspection labor for incoming scans, margins, fit, contacts, occlusion, shade, surface finish, labels, and final case release in dental and prosthetics production.
The inputs for this scenario
- Inspection points or appliances: 120 checks (held at the documented default)
- Inspection completion pace: 12 checks / hr (held at the documented default)
- Hold, recheck, and documentation allowance: 7.2 % (the input this scenario stresses; the baseline uses 10)
Working through the calculation
- The calculation starts from the formula this tool documents: Base inspection hours = inspection points or appliances รท inspection completion pace.
- Required quality inspection hours works out to 10.72 hr at these inputs, and this is the headline figure for the scenario.
- Base inspection hours works out to 10 hr at these inputs.
- Hold, recheck, and documentation allowance works out to 7.2 % at these inputs.
- Inspection completion pace works out to 12 pieces / min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where hold, recheck, and documentation allowance sits at 10% and the headline result is 11 hr, this scenario comes in 2.55% below the baseline at 10.72 hr.
- Use it for daily or shift QC staffing, when projecting headcount for a volume increase, or to justify why inspection is taking longer than raw piece counts suggest. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Required quality inspection hours: 10.72 hr (headline result)
- Base inspection hours: 10 hr
- Hold, recheck, and documentation allowance: 7.2 %
- Inspection completion pace: 12 pieces / min
Run it with your numbers
- To rerun this with your own numbers, open the live Quality Inspection Load calculator, set hold, recheck, and documentation allowance to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.