District Energy & Thermal Network Equipment worked example
Quote Margin with quoted selling price of 310 $: a worked example in district energy & thermal network equipment
Push quoted selling price up to 310 $ and the picture changes. This example computes every intermediate figure at that operating point. Use it when quote margin in district energy and thermal network equipment needs a clean margin number for a district energy and thermal network equipment go / no-go review.
The inputs for this scenario
- Quoted selling price: 310 $ (raised for this scenario; the documented default is 125)
- Estimated quote cost: 100 $ (unchanged)
- Reference quote revenue: 100 $ (unchanged)
Working through the calculation
- Applying the documented formula (Quote gross margin dollars = quoted selling price - estimated quote cost) to the inputs above produces each figure below.
- At this operating point the engine returns 210 % for quote margin, the number this scenario is built around.
- At this operating point the engine returns 210 value for quote gross margin dollars.
- At this operating point the engine returns 310 value for quoted selling price.
- At this operating point the engine returns 100 value for estimated quote cost.
How this compares with the baseline
- Against the tool's baseline example, where quoted selling price sits at 125 $ and the headline result is 25 %, this scenario comes in 740% above the baseline at 210 %.
- It computes gross margin as quoted price minus estimated cost, divided by a reference revenue figure, expressed as a percentage. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Quote margin: 210 % (headline result)
- Quote gross margin dollars: 210 value
- Quoted selling price: 310 value
- Estimated quote cost: 100 value
Run it with your numbers
- Every input above is editable in the live Quote Margin calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.