District Energy & Thermal Network Equipment worked example
Thermal Network Supplier Risk Score with supplier impact severity score of 3 score: a worked example
This worked example runs the thermal network supplier risk score numbers for a tougher week than the baseline: supplier impact severity score of 3 score instead of the typical 6 score. Score supplier risk for boilers, heat exchangers, pumps, valves, meters, controls, pipe, insulation, and thermal storage packages before procurement or bid release.
The inputs for this scenario
- Supplier impact severity score: 3 score (the input this scenario stresses; the baseline uses 6)
- Supplier issue occurrence score: 4 score (held at the documented default)
- Supplier detection control score: 3 score (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Thermal network supplier risk score = supplier impact severity score × supplier issue occurrence score × supplier detection control score.
- Thermal network supplier risk score works out to 3.35 score at these inputs, and this is the headline figure for the scenario.
- Supplier impact severity score works out to 3 score at these inputs.
- Supplier issue occurrence score works out to 4 score at these inputs.
- Supplier detection control score works out to 3 score at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where supplier impact severity score sits at 6 score and the headline result is 4.55 score, this scenario comes in 26.37% below the baseline at 3.35 score.
- Use it during supplier qualification, annual vendor reviews, or when deciding which thermal network components need a second source or tighter incoming inspection. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Thermal network supplier risk score: 3.35 score (headline result)
- Supplier impact severity score: 3 score
- Supplier issue occurrence score: 4 score
- Supplier detection control score: 3 score
Run it with your numbers
- To rerun this with your own numbers, open the live Thermal Network Supplier Risk Score calculator, set supplier impact severity score to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.