Electronics Manufacturing worked example

Electronics Manufacturing Cost with build quantity of 750 assemblies: a worked example

This worked example runs the electronics manufacturing cost numbers for a tougher week than the baseline: build quantity of 750 assemblies instead of the typical 1,500 assemblies. Estimate total electronics manufacturing cost from build quantity, variable assembly cost, labor/setup cost, and overhead.

The inputs for this scenario

  • Build quantity: 750 assemblies (the input this scenario stresses; the baseline uses 1,500)
  • Variable manufacturing cost: 18.5 $ / assembly (held at the documented default)
  • Assembly labor and setup cost: 4,200 $ (held at the documented default)
  • Manufacturing overhead and program burden: 3,100 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Total electronics manufacturing cost = build quantity × variable manufacturing cost + labor/setup + overhead.
  • Total electronics manufacturing cost works out to 21,175 $ at these inputs, and this is the headline figure for the scenario.
  • Manufacturing cost per assembly works out to 28.23 $ / assembly at these inputs.
  • Variable assembly cost works out to 13,875 $ at these inputs.
  • Labor, setup, overhead, and burden adders works out to 7,300 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where build quantity sits at 1,500 assemblies and the headline result is 35,050 $, this scenario comes in 39.59% below the baseline at 21,175 $.
  • Use it when quoting a PCBA build, evaluating an EMS quote, or sizing the volume needed to hit a target board cost. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total electronics manufacturing cost: 21,175 $ (headline result)
  • Manufacturing cost per assembly: 28.23 $ / assembly
  • Variable assembly cost: 13,875 $
  • Labor, setup, overhead, and burden adders: 7,300 $