Electronics Manufacturing worked example
SMT Cycle Time at 8.64% board handling and minor-stop allowance: a worked example
Here is what the math looks like when conditions slip. We hold every other input steady and drop board handling and minor-stop allowance to 8.64%, then walk the calculation through step by step. Estimate placement cycle seconds per board or panel from placement count, machine placement rate, and setup/handling allowance.
The inputs for this scenario
- Placements per SMT cycle: 1,250 placements (held at the documented default)
- Achieved placement speed: 18 placements / sec (held at the documented default)
- Board handling and minor-stop allowance: 8.64 % (the input this scenario stresses; the baseline uses 12)
Working through the calculation
- The calculation starts from the formula this tool documents: Placement-only cycle time = placements per SMT cycle รท achieved placement speed.
- Estimated SMT cycle time works out to 75.44 sec at these inputs, and this is the headline figure for the scenario.
- Placement-only cycle time works out to 69.44 sec at these inputs.
- Handling and minor-stop allowance works out to 8.64 % at these inputs.
- Achieved placement speed works out to 18 placements / sec at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where board handling and minor-stop allowance sits at 12% and the headline result is 77.78 sec, this scenario comes in 3% below the baseline at 75.44 sec.
- The practical read: the gap between this scenario and the baseline is entirely attributable to board handling and minor-stop allowance, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. It uses a single blended placement speed, so it won't capture per-component differences like fine-pitch QFNs or odd-form parts that place far slower than chip components.
Results at a glance
- Estimated SMT cycle time: 75.44 sec (headline result)
- Placement-only cycle time: 69.44 sec
- Handling and minor-stop allowance: 8.64 %
- Achieved placement speed: 18 placements / sec
Run it with your numbers
- To rerun this with your own numbers, open the live SMT Cycle Time calculator, set board handling and minor-stop allowance to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.