Electronics Repair, Refurbishment & Depot Operations worked example
Failure Pareto Cost at 92% share of failures in pareto scope: a worked example
What does the result look like when share of failures in pareto scope reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when failure pareto cost in electronics repair, refurbishment and depot operations is being put through a electronics repair, refurbishment and depot operations weighted-cost review.
The inputs for this scenario
- RMA units in this failure mode: 100 units (unchanged)
- Cost per failure occurrence: 45 $ / occurrence (unchanged)
- Share of failures in Pareto scope: 92 % (raised for this scenario; the documented default is 80)
- Fixed containment or investigation cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable failure Pareto cost = failure-mode RMA units × cost per failure occurrence × Pareto scope included) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total failure pareto cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for failure cost per rma unit.
- At this operating point the engine returns 4,140 $ for variable failure pareto cost.
- At this operating point the engine returns 250 $ for fixed containment or investigation cost.
How this compares with the baseline
- Against the tool's baseline example, where share of failures in pareto scope sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when share of failures in pareto scope is genuinely sustained, not just peaked for a shift. It assumes a single, uniform cost per occurrence, so a failure mode with a wide spread of repair costs needs to be split before the number is trustworthy.
Results at a glance
- Total failure Pareto cost: 4,390 $ (headline result)
- Failure cost per RMA unit: 43.9 $ / piece
- Variable failure Pareto cost: 4,140 $
- Fixed containment or investigation cost: 250 $
Run it with your numbers
- Every input above is editable in the live Failure Pareto Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.