Electronics Repair, Refurbishment & Depot Operations worked example
BGA Reball/Reflow Labor Cost at 92% boards requiring reball and reflow: a worked example
Push boards requiring reball and reflow up to 92% and the picture changes. This example computes every intermediate figure at that operating point. Use it when bga reball/reflow labor cost in electronics repair, refurbishment and depot operations is being put through a electronics repair, refurbishment and depot operations weighted-cost review.
The inputs for this scenario
- Boards routed to reball/reflow: 100 boards (unchanged)
- Labor cost per reball/reflow board: 45 $ / board (unchanged)
- Boards requiring reball/reflow: 92 % (raised for this scenario; the documented default is 80)
- Fixed fixture, stencil, or X-ray cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable reball/reflow labor cost = boards routed to reball/reflow × labor cost per reball/reflow board × boards requiring reball/reflow) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total bga reball/reflow labor cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for reball/reflow labor cost per board.
- At this operating point the engine returns 4,140 $ for variable reball/reflow labor cost.
- At this operating point the engine returns 250 $ for fixed fixture, stencil, or x-ray cost.
How this compares with the baseline
- Against the tool's baseline example, where boards requiring reball and reflow sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- It computes total reball/reflow labor cost for a batch and the average cost per board, combining per-board rework labor scaled by the share of boards needing reball plus fixed fixture, stencil, and X-ray cost. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total BGA reball/reflow labor cost: 4,390 $ (headline result)
- Reball/reflow labor cost per board: 43.9 $ / piece
- Variable reball/reflow labor cost: 4,140 $
- Fixed fixture, stencil, or X-ray cost: 250 $
Run it with your numbers
- Every input above is editable in the live BGA Reball/Reflow Labor Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.