Elevators, Escalators & Vertical Transport Equipment worked example
Elevator Motor Load Margin with available motor and drive capacity of 110 kW-equivalent: a worked example
This scenario runs the elevator motor load margin calculation on the strong side: available motor and drive capacity of 110 kW-equivalent, with every other input held at its documented default. a product engineer or modernization specialist needs a quick motor headroom check before selecting a drive package
The inputs for this scenario
- Available motor and drive capacity: 110 kW-equivalent (raised for this scenario; the documented default is 42)
- Required hoisting load demand: 35 kW-equivalent (unchanged)
- Reference load demand: 35 kW-equivalent (unchanged)
Working through the calculation
- Applying the documented formula (Motor capacity headroom = available motor and drive capacity - required hoisting load demand) to the inputs above produces each figure below.
- At this operating point the engine returns 214 % for elevator motor load margin, the number this scenario is built around.
- At this operating point the engine returns 75 kW-equivalent for motor capacity headroom.
- At this operating point the engine returns 110 kW-equivalent for available motor and drive capacity.
- At this operating point the engine returns 35 kW-equivalent for required hoisting load demand.
How this compares with the baseline
- Against the tool's baseline example, where available motor and drive capacity sits at 42 kW-equivalent and the headline result is 20 %, this scenario comes in 971% above the baseline at 214 %.
- Use it during a modernization study, a duty or car-weight change, or when diagnosing whether a machine is sized adequately for its hoisting demand. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Elevator motor load margin: 214 % (headline result)
- Motor capacity headroom: 75 kW-equivalent
- Available motor and drive capacity: 110 kW-equivalent
- Required hoisting load demand: 35 kW-equivalent
Run it with your numbers
- Every input above is editable in the live Elevator Motor Load Margin calculator, which recalculates instantly and can be shared with the inputs intact.