Elevators, Escalators & Vertical Transport Equipment worked example

Packaging and Crating Cost at 110% shipment scope captured: a worked example

Push shipment scope captured up to 110% and the picture changes. This example computes every intermediate figure at that operating point. a logistics or estimating team needs crating cost for a project shipment

The inputs for this scenario

  • Crates or protected shipping units: 18 crates (unchanged)
  • Average packaging and crating cost: 420 $ / crate (unchanged)
  • Shipment scope captured: 110 % (raised for this scenario; the documented default is 100)
  • Fixed export, handling, or special packaging cost: 1,100 $ (unchanged)

Working through the calculation

  • Applying the documented formula (Variable crating cost = crates or protected shipping units × average packaging and crating cost × shipment scope captured) to the inputs above produces each figure below.
  • At this operating point the engine returns 9,416 $ for total packaging and crating cost, the number this scenario is built around.
  • At this operating point the engine returns 523 $ / crate for packaging cost per crate.
  • At this operating point the engine returns 8,316 $ for variable crating cost.
  • At this operating point the engine returns 1,100 $ for fixed export and handling cost.

How this compares with the baseline

  • Against the tool's baseline example, where shipment scope captured sits at 100% and the headline result is 8,660 $, this scenario comes in 8.73% above the baseline at 9,416 $.
  • It computes total packaging and crating cost as crate count times per-crate cost times the share of the shipment captured, plus a fixed export, handling, or special-packaging charge. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Total packaging and crating cost: 9,416 $ (headline result)
  • Packaging cost per crate: 523 $ / crate
  • Variable crating cost: 8,316 $
  • Fixed export and handling cost: 1,100 $

Run it with your numbers

  • Every input above is editable in the live Packaging and Crating Cost calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.