Elevators, Escalators & Vertical Transport Equipment worked example
Service Parts Reserve at 92% reserve coverage captured: a worked example
Push reserve coverage captured up to 92% and the picture changes. This example computes every intermediate figure at that operating point. a service manager or finance lead needs to reserve parts cost for installed vertical transport equipment
The inputs for this scenario
- Covered elevator or escalator units: 240 units (unchanged)
- Expected service parts cost per unit: 185 $ / unit (unchanged)
- Reserve coverage captured: 92 % (raised for this scenario; the documented default is 80)
- Fixed stocking, logistics, and obsolescence cost: 4,500 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable service parts reserve = covered units × expected service parts cost per unit × reserve coverage captured) to the inputs above produces each figure below.
- At this operating point the engine returns 45,348 $ for total service parts reserve, the number this scenario is built around.
- At this operating point the engine returns 189 $ / unit for reserve cost per covered unit.
- At this operating point the engine returns 40,848 $ for variable service parts reserve.
- At this operating point the engine returns 4,500 $ for stocking and logistics reserve.
How this compares with the baseline
- Against the tool's baseline example, where reserve coverage captured sits at 80% and the headline result is 40,020 $, this scenario comes in 13.31% above the baseline at 45,348 $.
- It computes the total dollar reserve needed to cover service parts across a fleet, combining per-unit parts cost scaled by coverage with a fixed stocking and logistics overhead. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total service parts reserve: 45,348 $ (headline result)
- Reserve cost per covered unit: 189 $ / unit
- Variable service parts reserve: 40,848 $
- Stocking and logistics reserve: 4,500 $
Run it with your numbers
- Every input above is editable in the live Service Parts Reserve calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.