Energy & Sustainability worked example
Chiller Energy Cost with average chiller electrical demand of 1,100 kW: a worked example
This scenario runs the chiller energy cost calculation on the strong side: average chiller electrical demand of 1,100 kW, with every other input held at its documented default. a facilities or energy manager needs to estimate cooling electricity cost
The inputs for this scenario
- Average chiller electrical demand: 1,100 kW (raised for this scenario; the documented default is 420)
- Chiller runtime: 240 hr (unchanged)
- Blended electricity rate: 0.13 $ / kWh (unchanged)
- Cooling tons, batches, or units served: 185,000 units (unchanged)
Working through the calculation
- Applying the documented formula (Chiller electricity used = average chiller electrical demand × chiller runtime) to the inputs above produces each figure below.
- At this operating point the engine returns 34,320 $ for total chiller electricity cost, the number this scenario is built around.
- At this operating point the engine returns 264,000 kWh for chiller electricity used.
- At this operating point the engine returns 0.19 $ / unit for chiller cost per served unit.
- At this operating point the engine returns 143 $ / hr for chiller electricity cost per runtime hour.
How this compares with the baseline
- Against the tool's baseline example, where average chiller electrical demand sits at 420 kW and the headline result is 13,104 $, this scenario comes in 162% above the baseline at 34,320 $.
- Use it for monthly energy budgeting, per-unit cost allocation, or building the business case for a chiller efficiency upgrade. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total chiller electricity cost: 34,320 $ (headline result)
- Chiller electricity used: 264,000 kWh
- Chiller cost per served unit: 0.19 $ / unit
- Chiller electricity cost per runtime hour: 143 $ / hr
Run it with your numbers
- Every input above is editable in the live Chiller Energy Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.