Energy & Sustainability worked example

Recycled Content Rate at 40% recycled content target: a worked example

This scenario runs the recycled content rate calculation on the strong side: 40% recycled content target, with every other input held at its documented default. a procurement or sustainability lead needs recycled content percentage against a target

The inputs for this scenario

  • Recycled material input: 42,000 lb (unchanged)
  • Total material input: 100,000 lb (unchanged)
  • Recycled content target: 40 % (raised for this scenario; the documented default is 35)

Working through the calculation

  • Applying the documented formula (Recycled content rate = recycled material input ÷ total material input × 100) to the inputs above produces each figure below.
  • At this operating point the engine returns 42 % for recycled content rate, the number this scenario is built around.
  • At this operating point the engine returns -2 points for gap to recycled content target.
  • At this operating point the engine returns 42,000 lb for recycled material input.
  • At this operating point the engine returns 100,000 lb for total material input.

How this compares with the baseline

  • Against the tool's baseline example, where recycled content target sits at 35% and the headline result is 42 %, this scenario lands almost exactly on the baseline at 42 %.
  • Use it when validating a recycled-content claim, formulating a material blend to hit a spec, or reporting against a regulatory minimum. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Recycled content rate: 42 % (headline result)
  • Gap to recycled content target: -2 points
  • Recycled material input: 42,000 lb
  • Total material input: 100,000 lb

Run it with your numbers

  • Every input above is editable in the live Recycled Content Rate calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.