Energy & Sustainability worked example
Renewable Energy Percentage at 36% renewable electricity target for the period: a worked example
This worked example runs the renewable energy percentage numbers for a tougher week than the baseline: 36% renewable electricity target for the period instead of the typical 50%. Calculate renewable electricity share from renewable kWh, total electricity use, and a target percentage.
The inputs for this scenario
- Renewable electricity supplied (contracts plus on-site generation): 920,000 kWh (held at the documented default)
- Total site electricity consumption: 2,500,000 kWh (held at the documented default)
- Renewable electricity target for the period: 36 % (the input this scenario stresses; the baseline uses 50)
Working through the calculation
- The calculation starts from the formula this tool documents: Renewable energy percentage = renewable electricity supplied ÷ total electricity consumption × 100.
- Renewable electricity share works out to 36.8 % at these inputs, and this is the headline figure for the scenario.
- Gap to renewable electricity target works out to -0.8 points at these inputs.
- Renewable electricity supplied works out to 920,000 kWh at these inputs.
- Total electricity consumption works out to 2,500,000 kWh at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where renewable electricity target for the period sits at 50% and the headline result is 36.8 %, this scenario lands almost exactly on the baseline at 36.8 %.
- Use it for quarterly or annual ESG reporting, RE100 progress tracking, or sizing the next PPA or REC purchase needed to hit a goal. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Renewable electricity share: 36.8 % (headline result)
- Gap to renewable electricity target: -0.8 points
- Renewable electricity supplied: 920,000 kWh
- Total electricity consumption: 2,500,000 kWh
Run it with your numbers
- To rerun this with your own numbers, open the live Renewable Energy Percentage calculator, set renewable electricity target for the period to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.