Safety & Workforce calculator

Ergonomic Risk Score Calculator

Score ergonomic risk from posture, force, and repetition factors. Score severity, occurrence, and detection to get a single weighted risk number for ranking.

What this calculator does

  • Score ergonomic risk from posture, force, and repetition factors.
  • Use it when ergonomic risk in safety and workforce needs a defensible ranking against other safety and workforce risks for the next review.
  • Turns severity factor, occurrence factor, detection factor into a risk score for ergonomic risk in safety and workforce.

Formula used

  • Weighted score = severity × 0.40 + occurrence × 0.35 + detection × 0.25

Inputs explained

  • Severity factor: undefined
  • Occurrence factor: undefined
  • Detection factor: undefined

How to use the result

  • Use it when ergonomic risk in safety and workforce is going through an FMEA or hazard review.
  • Scores are subjective. Use them to rank, not to claim absolute risk.

Common questions

  • What does the ergonomic risk score calculator give me? Score ergonomic risk from posture, force, and repetition factors. You get a risk score you can defend before quoting, scheduling, or sign-off.
  • Which assumptions drive the risk score? severity factor, occurrence factor, detection factor usually move the risk score most. Pull from measured safety and workforce runs, supplier data, and recent quotes rather than memory.
  • How should I use the result? Use the score to rank against other safety and workforce risks. Treat it as a sort key, not an absolute number.
  • What should I verify first? Validate scoring with a second person; scores are subjective and drift between reviewers.

Last reviewed 2026-05-12.