ERP & MRP Planning worked example
Master Production Schedule Load with planned order quantity of 2,100 units: a worked example
This scenario runs the master production schedule load calculation on the strong side: planned order quantity of 2,100 units, with every other input held at its documented default. a master scheduler needs MPS load hours for a product family
The inputs for this scenario
- Planned order quantity: 2,100 units (raised for this scenario; the documented default is 850)
- Standard routing hours per unit: 1.6 hr / unit (unchanged)
- Model mix or complexity factor: 1.08 x (unchanged)
- Setup and planning multiplier: 1.12 x (unchanged)
Working through the calculation
- Applying the documented formula (MPS load hours = planned order quantity × standard routing hours per unit × model mix factor × setup and planning multiplier) to the inputs above produces each figure below.
- At this operating point the engine returns 4,064 hr for master production schedule load hours, the number this scenario is built around.
- At this operating point the engine returns 3,629 hr for mps load before setup multiplier.
- At this operating point the engine returns 1.12 x for setup and planning multiplier.
- At this operating point the engine returns 3,360 hr for planned quantity × standard hours.
How this compares with the baseline
- Against the tool's baseline example, where planned order quantity sits at 850 units and the headline result is 1,645 hr, this scenario comes in 147% above the baseline at 4,064 hr.
- Use it during rough-cut and detailed capacity planning, before you firm an MPS, to confirm the planned quantity fits available hours. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Master production schedule load hours: 4,064 hr (headline result)
- MPS load before setup multiplier: 3,629 hr
- Setup and planning multiplier: 1.12 x
- Planned quantity × standard hours: 3,360 hr
Run it with your numbers
- Every input above is editable in the live Master Production Schedule Load calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.