EV Charging Infrastructure Manufacturing worked example
Charger Quote Margin with quoted charger or site-package price of 142,500 $: a worked example
This worked example runs the charger quote margin numbers for a tougher week than the baseline: quoted charger or site-package price of 142,500 $ instead of the typical 285,000 $. Calculate quote margin for EV charging equipment by comparing quoted selling price with required delivered cost.
The inputs for this scenario
- Quoted charger or site-package price: 142,500 $ (the input this scenario stresses; the baseline uses 285,000)
- Required delivered charger cost: 231,000 $ (held at the documented default)
- Reference quote price: 285,000 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Quote gross margin dollars = quoted charger price - required delivered charger cost.
- Charger quote gross margin works out to -31.05 % at these inputs, and this is the headline figure for the scenario.
- Quote gross margin dollars works out to -88,500 $ at these inputs.
- Quoted charger or site-package price works out to 142,500 $ at these inputs.
- Required delivered charger cost works out to 231,000 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where quoted charger or site-package price sits at 285,000 $ and the headline result is 18.95 %, this scenario comes in 264% below the baseline at -31.05 %.
- Use it when bidding a charger or full site package — single DC fast charger up to a multi-port depot — before the quote is submitted. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Charger quote gross margin: -31.05 % (headline result)
- Quote gross margin dollars: -88,500 $
- Quoted charger or site-package price: 142,500 $
- Required delivered charger cost: 231,000 $
Run it with your numbers
- To rerun this with your own numbers, open the live Charger Quote Margin calculator, set quoted charger or site-package price to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.