Explosives, Pyrotechnics & Energetic Materials Manufacturing worked example
Inspection Hold Time at 40% disposition and system-update allowance: a worked example
What does the result look like when disposition and system-update allowance reaches 40%? The full calculation is worked below with real intermediate numbers. a quality lead needs to estimate hold time before lots can be released or shipped
The inputs for this scenario
- Lots or records awaiting inspection: 72 items (unchanged)
- Inspections completed per hour: 9 items / hr (unchanged)
- Disposition and system-update allowance: 40 % (raised for this scenario; the documented default is 35)
Working through the calculation
- Applying the documented formula (Base inspection queue hours = lots or records awaiting inspection รท inspections completed per hour) to the inputs above produces each figure below.
- At this operating point the engine returns 11.2 hr for required inspection hold time, the number this scenario is built around.
- At this operating point the engine returns 8 hr for base inspection queue hours.
- At this operating point the engine returns 40 % for disposition and system-update allowance.
- At this operating point the engine returns 9 items / hr for inspections completed per hour.
How this compares with the baseline
- Against the tool's baseline example, where disposition and system-update allowance sits at 35% and the headline result is 10.8 hr, this scenario comes in 3.7% above the baseline at 11.2 hr.
- A figure at this level is achievable when disposition and system-update allowance is genuinely sustained, not just peaked for a shift. It assumes a steady inspection rate and one continuous queue; surge inspections, rejected lots requiring rework, or a stalled disposition signature will push actual hold time well past the estimate.
Results at a glance
- Required inspection hold time: 11.2 hr (headline result)
- Base inspection queue hours: 8 hr
- Disposition and system-update allowance: 40 %
- Inspections completed per hour: 9 items / hr
Run it with your numbers
- Every input above is editable in the live Inspection Hold Time calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.