OEE & Factory Performance calculator
Factory Performance Score Calculator
Score factory performance from availability, throughput, and quality factors. Score severity, occurrence, and detection to get a single weighted risk number for ranking.
What this calculator does
- Score factory performance from availability, throughput, and quality factors.
- Use it when factory performance in oee and factory performance needs a defensible ranking against other oee and factory performance risks for the next review.
- Turns severity factor, occurrence factor, detection factor into a risk score for factory performance in oee and factory performance.
Formula used
- Weighted score = severity × 0.40 + occurrence × 0.35 + detection × 0.25
Inputs explained
- Severity factor: undefined
- Occurrence factor: undefined
- Detection factor: undefined
How to use the result
- Use it when factory performance in oee and factory performance is going through an FMEA or hazard review.
- Scores are subjective. Use them to rank, not to claim absolute risk.
Common questions
- Why use this factory performance tool for oee and factory performance? Score factory performance from availability, throughput, and quality factors. You get a risk score you can defend before quoting, scheduling, or sign-off.
- What numbers should I focus on first? severity factor, occurrence factor, detection factor usually move the risk score most. Pull from measured oee and factory performance runs, supplier data, and recent quotes rather than memory.
- What do I do with this number? Use the score to rank against other oee and factory performance risks. Treat it as a sort key, not an absolute number.
- What should I double-check before acting? Validate scoring with a second person; scores are subjective and drift between reviewers.
Last reviewed 2026-05-12.