Fiber Optic Cable & Photonic Interconnects worked example
Connector Polish Yield at 68% target polish yield: a worked example
Here is what the math looks like when conditions slip. We hold every other input steady and drop target polish yield to 68%, then walk the calculation through step by step. Calculate connector polishing first-pass yield from accepted polished endfaces versus connectors polished and compare with the target.
The inputs for this scenario
- First-pass accepted polished connectors: 232 connectors (held at the documented default)
- Connectors polished: 250 connectors (held at the documented default)
- Target polish yield: 68 % (the input this scenario stresses; the baseline uses 95)
Working through the calculation
- The calculation starts from the formula this tool documents: Connector polish yield = first-pass accepted polished connectors ÷ connectors polished.
- Connector polish first-pass yield works out to 92.8 % at these inputs, and this is the headline figure for the scenario.
- Gap to polish-yield target works out to -24.8 points at these inputs.
- First-pass accepted connectors works out to 232 connectors at these inputs.
- Connectors polished works out to 250 connectors at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where target polish yield sits at 95% and the headline result is 92.8 %, this scenario lands almost exactly on the baseline at 92.8 %.
- The practical read: the gap between this scenario and the baseline is entirely attributable to target polish yield, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. First-pass yield ignores connectors recovered by rework — a cell can hit final yield while masking a poor first-pass rate that is quietly burning labor.
Results at a glance
- Connector polish first-pass yield: 92.8 % (headline result)
- Gap to polish-yield target: -24.8 points
- First-pass accepted connectors: 232 connectors
- Connectors polished: 250 connectors
Run it with your numbers
- To rerun this with your own numbers, open the live Connector Polish Yield calculator, set target polish yield to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.