Fire Suppression, Sprinkler & Safety System Products worked example
Agent Fill Cost at 72% chargeable agent-cost share: a worked example
Here is what the math looks like when conditions slip. We hold every other input steady and drop chargeable agent-cost share to 72%, then walk the calculation through step by step. Estimate suppression-agent fill cost from agent quantity, cost per unit, chargeable share, and fixed fill setup cost.
The inputs for this scenario
- Suppression agent charged: 850 lb, kg, gal, or L (held at the documented default)
- Agent price per unit: 22 $ / unit (held at the documented default)
- Chargeable agent-cost share: 72 % (the input this scenario stresses; the baseline uses 100)
- Fixed fill setup and handling cost: 275 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Agent Fill Cost = suppression agent quantity × agent cost per unit × chargeable agent-cost share + fixed fill setup or handling cost.
- Total agent fill cost works out to 13,739 $ at these inputs, and this is the headline figure for the scenario.
- Average agent fill cost per unit works out to 16.16 $ / unit at these inputs.
- Variable captured cost works out to 13,464 $ at these inputs.
- Fixed fill setup or handling cost works out to 275 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where chargeable agent-cost share sits at 100% and the headline result is 18,975 $, this scenario comes in 27.59% below the baseline at 13,739 $.
- The practical read: the gap between this scenario and the baseline is entirely attributable to chargeable agent-cost share, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. It models a single agent fill at one price point — it does not account for agent reclaim credits, scrap/boil-off loss, multi-agent blends, or vessel/valve hardware cost, which you add separately.
Results at a glance
- Total agent fill cost: 13,739 $ (headline result)
- Average agent fill cost per unit: 16.16 $ / unit
- Variable captured cost: 13,464 $
- Fixed fill setup or handling cost: 275 $
Run it with your numbers
- To rerun this with your own numbers, open the live Agent Fill Cost calculator, set chargeable agent-cost share to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.