Fire Suppression, Sprinkler & Safety System Products worked example
Inspection Sample Size at 98% inspection station uptime: a worked example in fire suppression, sprinkler & safety system products
This scenario runs the inspection sample size calculation on the strong side: 98% inspection station uptime, with every other input held at its documented default. Use it when planning QA sample inspections for sprinkler heads, valves, cylinders, alarms, detectors, extinguishers, brackets, or safety-system kits.
The inputs for this scenario
- Samples inspected per cycle: 10 samples / cycle (unchanged)
- Available inspection cycles: 48 cycles (unchanged)
- Inspection station uptime: 98 % (raised for this scenario; the documented default is 85)
- Accepted inspection record yield: 98 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross inspection sample size = samples inspected per cycle × available inspection cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 461 units for good output capacity, the number this scenario is built around.
- At this operating point the engine returns 480 units for gross capacity before uptime and yield.
- At this operating point the engine returns 9.6 units for availability loss.
- At this operating point the engine returns 9.41 units for reject or rework allowance.
How this compares with the baseline
- Against the tool's baseline example, where inspection station uptime sits at 85% and the headline result is 400 units, this scenario comes in 15.29% above the baseline at 461 units.
- Use it when planning inspection throughput for a fire protection component lot, sizing a QC shift, or checking whether one station can clear incoming volume. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Good output capacity: 461 units (headline result)
- Gross capacity before uptime and yield: 480 units
- Availability loss: 9.6 units
- Reject or rework allowance: 9.41 units
Run it with your numbers
- Every input above is editable in the live Inspection Sample Size calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.