Fire Suppression, Sprinkler & Safety System Products worked example
Packaging Count at 99% packaging station uptime: a worked example in fire suppression, sprinkler & safety system products
What does the result look like when packaging station uptime reaches 99%? The full calculation is worked below with real intermediate numbers. Use it when planning packaging for sprinkler heads, valves, cylinders, extinguishers, alarm devices, detectors, signage, or safety-system kits.
The inputs for this scenario
- Sprinkler heads packaged per cycle: 24 products / cycle (unchanged)
- Available packaging cycles per shift: 60 cycles (unchanged)
- Packaging station uptime: 99 % (raised for this scenario; the documented default is 90)
- Accepted pack-out yield: 98 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross packaging count = products packaged per cycle × available packaging cycles) to the inputs above produces each figure below.
- At this operating point the engine returns 1,397 units for good output capacity, the number this scenario is built around.
- At this operating point the engine returns 1,440 units for gross capacity before uptime and yield.
- At this operating point the engine returns 14.4 units for availability loss.
- At this operating point the engine returns 28.51 units for reject or rework allowance.
How this compares with the baseline
- Against the tool's baseline example, where packaging station uptime sits at 90% and the headline result is 1,270 units, this scenario comes in 10% above the baseline at 1,397 units.
- A figure at this level is achievable when packaging station uptime is genuinely sustained, not just peaked for a shift. It assumes uptime and yield hold steady across the shift; a single jammed labeler or a bad carton lot can pull real output well below the modeled good capacity.
Results at a glance
- Good output capacity: 1,397 units (headline result)
- Gross capacity before uptime and yield: 1,440 units
- Availability loss: 14.4 units
- Reject or rework allowance: 28.51 units
Run it with your numbers
- Every input above is editable in the live Packaging Count calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.