Fitness Equipment & Connected Exercise Hardware worked example
Motor Drive Test Load with motor-drive test load of 3.25 kW: a worked example
This worked example runs the motor drive test load numbers for a tougher week than the baseline: motor-drive test load of 3.25 kW instead of the typical 6.5 kW. Estimate motor-drive test energy and cost for treadmills, incline systems, resistance motors, or powered exercise equipment.
The inputs for this scenario
- Motor-drive test load: 3.25 kW (the input this scenario stresses; the baseline uses 6.5)
- Motor or drive test runtime: 8 hr (held at the documented default)
- Blended electricity rate: 0.12 $ / kWh (held at the documented default)
- Units tested during runtime: 120 units (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Total motor drive test load energy cost = motor-drive test load × motor or drive test runtime × blended electricity rate.
- Motor Drive Test Load energy used works out to 26 kWh at these inputs, and this is the headline figure for the scenario.
- Total motor drive test load energy cost works out to 3.12 $ at these inputs.
- Energy cost per tested unit works out to 0.03 $ / unit at these inputs.
- Hourly motor drive test load energy cost works out to 0.39 $ / hr at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where motor-drive test load sits at 6.5 kW and the headline result is 52 kWh, this scenario comes in 50% below the baseline at 26 kWh.
- Use it when costing or budgeting end-of-line motor and drive testing and you need energy use, total cost, and per-unit cost. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Motor Drive Test Load energy used: 26 kWh (headline result)
- Total motor drive test load energy cost: 3.12 $
- Energy cost per tested unit: 0.03 $ / unit
- Hourly motor drive test load energy cost: 0.39 $ / hr
Run it with your numbers
- To rerun this with your own numbers, open the live Motor Drive Test Load calculator, set motor-drive test load to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.