Fixture, Gauge & Workholding Management worked example
Fixture Inventory Accuracy at 71% target fixture inventory accuracy: a worked example
This worked example runs the fixture inventory accuracy numbers for a tougher week than the baseline: 71% target fixture inventory accuracy instead of the typical 98%. Calculate fixture inventory accuracy by comparing correctly located, identified, and usable fixtures with the audited fixture population.
The inputs for this scenario
- Correctly recorded fixtures: 286 fixtures (held at the documented default)
- Fixtures audited: 310 fixtures (held at the documented default)
- Target fixture inventory accuracy: 71 % (the input this scenario stresses; the baseline uses 98)
Working through the calculation
- The calculation starts from the formula this tool documents: Fixture Inventory Accuracy rate = correctly recorded fixtures ÷ fixtures audited × 100.
- Fixture Inventory Accuracy rate works out to 92.26 % at these inputs, and this is the headline figure for the scenario.
- Fixture Inventory Accuracy gap to target works out to -21.26 points at these inputs.
- Correctly recorded fixtures works out to 286 fixtures at these inputs.
- Fixtures audited works out to 310 fixtures at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where target fixture inventory accuracy sits at 98% and the headline result is 92.26 %, this scenario lands almost exactly on the baseline at 92.26 %.
- Use it after a cycle count or annual tool crib audit to score data integrity and decide whether corrective action is needed. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Fixture Inventory Accuracy rate: 92.26 % (headline result)
- Fixture Inventory Accuracy gap to target: -21.26 points
- Correctly recorded fixtures: 286 fixtures
- Fixtures audited: 310 fixtures