Fixture, Gauge & Workholding Management worked example
Fixture Lifecycle Cost at 110% program scope covered: a worked example
Push program scope covered up to 110% and the picture changes. This example computes every intermediate figure at that operating point. Use it when comparing fixture concepts, dedicated versus modular tooling, supplier proposals, or expected cost over a program life.
The inputs for this scenario
- Fixtures in lifecycle plan: 18 fixtures (unchanged)
- Lifecycle cost per fixture: 9,200 $ / fixture (unchanged)
- Program scope covered: 110 % (raised for this scenario; the documented default is 100)
- Fixed retirement, recertification, or storage cost: 14,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable fixture lifecycle cost = fixtures in lifecycle plan × lifecycle cost per fixture × program scope covered) to the inputs above produces each figure below.
- At this operating point the engine returns 196,160 $ for total fixture lifecycle cost, the number this scenario is built around.
- At this operating point the engine returns 10,898 $ / piece for lifecycle cost per fixture.
- At this operating point the engine returns 182,160 $ for variable fixture lifecycle cost.
- At this operating point the engine returns 14,000 $ for fixed retirement, recertification, or storage cost.
How this compares with the baseline
- Against the tool's baseline example, where program scope covered sits at 100% and the headline result is 179,600 $, this scenario comes in 9.22% above the baseline at 196,160 $.
- It multiplies the number of fixtures by the per-fixture lifecycle cost and the share of the program scope covered, then adds a fixed lump for retirement, recertification or storage to give total fleet lifecycle cost. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total fixture lifecycle cost: 196,160 $ (headline result)
- Lifecycle cost per fixture: 10,898 $ / piece
- Variable fixture lifecycle cost: 182,160 $
- Fixed retirement, recertification, or storage cost: 14,000 $
Run it with your numbers
- Every input above is editable in the live Fixture Lifecycle Cost calculator, which recalculates instantly and can be shared with the inputs intact.