Fixture, Gauge & Workholding Management worked example
Jig Build Cost at 110% share of jig scope included: a worked example
What does the result look like when share of jig scope included reaches 110%? The full calculation is worked below with real intermediate numbers. Use it when quoting or budgeting a jig that controls part location, repeatability, operation sequence, or assembly quality.
The inputs for this scenario
- Number of jigs to build: 8 jigs (unchanged)
- Build cost per jig: 2,400 $ / jig (unchanged)
- Share of jig scope included: 110 % (raised for this scenario; the documented default is 100)
- Fixed design, tryout, and documentation cost: 1,800 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable jig build cost = jigs to build × build cost per jig × jig scope included) to the inputs above produces each figure below.
- At this operating point the engine returns 22,920 $ for total jig build cost, the number this scenario is built around.
- At this operating point the engine returns 2,865 $ / piece for average jig build cost.
- At this operating point the engine returns 21,120 $ for variable jig build cost.
- At this operating point the engine returns 1,800 $ for fixed design, tryout, or documentation cost.
How this compares with the baseline
- Against the tool's baseline example, where share of jig scope included sits at 100% and the headline result is 21,000 $, this scenario comes in 9.14% above the baseline at 22,920 $.
- A figure at this level is achievable when share of jig scope included is genuinely sustained, not just peaked for a shift. It assumes every jig in the batch costs the same per unit; if the set mixes simple drill jigs with complex multi-axis assembly jigs, run them as separate batches or your average will mislead.
Results at a glance
- Total jig build cost: 22,920 $ (headline result)
- Average jig build cost: 2,865 $ / piece
- Variable jig build cost: 21,120 $
- Fixed design, tryout, or documentation cost: 1,800 $
Run it with your numbers
- Every input above is editable in the live Jig Build Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.