Fixture, Gauge & Workholding Management worked example

Workholding Automation Payback with automated workholding investment of 42,500 $: a worked example

This worked example runs the workholding automation payback numbers for a tougher week than the baseline: automated workholding investment of 42,500 $ instead of the typical 85,000 $. Estimate payback for automated or assisted workholding such as hydraulic clamps, pneumatic clamps, robot-loaded fixtures, pallet pools, or zero-point automation.

The inputs for this scenario

  • Automated workholding investment: 42,500 $ (the input this scenario stresses; the baseline uses 85,000)
  • Annual automation savings: 42,000 $ / yr (held at the documented default)
  • Annual automation support cost: 9,000 $ / yr (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Net annual workholding automation payback savings = annual automation savings - annual automation support cost.
  • Workholding Automation Payback payback period works out to 1.29 yr at these inputs, and this is the headline figure for the scenario.
  • Net annual workholding automation payback savings works out to 33,000 $ / yr at these inputs.
  • Automated workholding investment works out to 42,500 $ at these inputs.
  • Five-year net workholding automation payback value works out to 122,500 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where automated workholding investment sits at 85,000 $ and the headline result is 2.58 yr, this scenario comes in 50% below the baseline at 1.29 yr.
  • Use it when evaluating a capital purchase of automated workholding and you need a simple payback figure for a justification or AFE. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Workholding Automation Payback payback period: 1.29 yr (headline result)
  • Net annual workholding automation payback savings: 33,000 $ / yr
  • Automated workholding investment: 42,500 $
  • Five-year net workholding automation payback value: 122,500 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Workholding Automation Payback calculator, set automated workholding investment to your actual value, and adjust the remaining inputs to match your operation.