Foundry & Forging worked example
Sand Usage Calculator at 98% target sand system loading: a worked example
Push target sand system loading up to 98% and the picture changes. This example computes every intermediate figure at that operating point. Use it when green sand, no-bake sand, chemically bonded sand, reclaimed sand, or core sand usage may constrain a production lot.
The inputs for this scenario
- Sand required for molds and cores: 36,000 lb (unchanged)
- Available prepared sand: 48,000 lb (unchanged)
- Target sand system loading: 98 % (raised for this scenario; the documented default is 85)
Working through the calculation
- Applying the documented formula (Sand Usage Calculator utilization = sand required for molds and cores ÷ available prepared sand × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 75 % for sand usage calculator utilization, the number this scenario is built around.
- At this operating point the engine returns 23 points for sand usage calculator gap to target.
- At this operating point the engine returns 36,000 value for sand required for molds and cores.
- At this operating point the engine returns 48,000 value for available prepared sand.
How this compares with the baseline
- Against the tool's baseline example, where target sand system loading sits at 85% and the headline result is 75 %, this scenario lands almost exactly on the baseline at 75 %.
- It computes sand system utilization as required sand over available sand as a percent, then the gap in points to your target loading. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Sand Usage Calculator utilization: 75 % (headline result)
- Sand Usage Calculator gap to target: 23 points
- Sand required for molds and cores: 36,000 value
- Available prepared sand: 48,000 value
Run it with your numbers
- Every input above is editable in the live Sand Usage Calculator calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.