Heat Treatment, Furnaces & Thermal Processing worked example
Furnace OEE at 68% performance: a worked example
This worked example runs the furnace oee numbers for a tougher week than the baseline: 68% performance instead of the typical 95%. Calculate OEE for Heat Treatment, Furnaces & Thermal Processing from availability, performance, and quality to see how much of planned production time becomes good output.
The inputs for this scenario
- Operating (run) time: 410 min (held at the documented default)
- Planned production time: 480 min (held at the documented default)
- Performance: 68 % (the input this scenario stresses; the baseline uses 95)
- Quality (first-pass yield): 98 % (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Availability = operating time ÷ planned production time.
- OEE works out to 56.92 % at these inputs, and this is the headline figure for the scenario.
- Availability works out to 85.42 % at these inputs.
- Performance works out to 68 % at these inputs.
- Quality works out to 98 % at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where performance sits at 95% and the headline result is 79.52 %, this scenario comes in 28.42% below the baseline at 56.92 %.
- Use it on batch or continuous furnaces — box, pit, pusher, mesh-belt, or vacuum — when you have run time, planned time, and credible performance and quality figures. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- OEE: 56.92 % (headline result)
- Availability: 85.42 %
- Performance: 68 %
- Quality: 98 %
Run it with your numbers
- To rerun this with your own numbers, open the live Furnace OEE calculator, set performance to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.