Heat Treatment, Furnaces & Thermal Processing worked example
Tempering Cycle Cost at 65% cost capture rate: a worked example
Suppose cost capture rate falls to 65%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimate tempering cycle cost from batch size, per-part tempering rate, cost capture, and fixed furnace or certification adders.
The inputs for this scenario
- Parts tempered per cycle: 250 parts (held at the documented default)
- Tempering rate per part: 1.85 $/part (held at the documented default)
- Cost capture rate: 65 % (the input this scenario stresses; the baseline uses 90)
- Furnace and cert adder: 350 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Total cost = parts tempered x tempering rate per part x cost capture% + furnace and cert adder.
- Total tempering cycle cost works out to 651 $ at these inputs, and this is the headline figure for the scenario.
- Tempering cost per part works out to 2.6 $ / part at these inputs.
- Captured tempering cost works out to 301 $ at these inputs.
- Fixed tempering cycle adder works out to 350 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where cost capture rate sits at 90% and the headline result is 766 $, this scenario comes in 15.09% below the baseline at 651 $.
- It computes total tempering cycle cost as captured variable cost plus a fixed furnace/cert adder, then divides by parts to give cost per part. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Total tempering cycle cost: 651 $ (headline result)
- Tempering cost per part: 2.6 $ / part
- Captured tempering cost: 301 $
- Fixed tempering cycle adder: 350 $
Run it with your numbers
- To rerun this with your own numbers, open the live Tempering Cycle Cost calculator, set cost capture rate to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.