Hydraulic, Pneumatic & Fluid Power Systems worked example
Leak Cost at 92% continuous-leak duty factor: a worked example
This scenario runs the leak cost calculation on the strong side: 92% continuous-leak duty factor, with every other input held at its documented default. Use it when leak cost in hydraulic, pneumatic and fluid power systems is being put through a hydraulic, pneumatic and fluid power systems weighted-cost review.
The inputs for this scenario
- Leaked air or fluid volume: 100 units (unchanged)
- Cost per unit of leaked media: 45 $ / unit (unchanged)
- Continuous-leak duty factor: 92 % (raised for this scenario; the documented default is 80)
- Fixed repair and labor cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Leak Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where continuous-leak duty factor sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it after an ultrasonic or flow survey gives you a leak rate, to prioritize which leaks to tag and repair first. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Leak Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.