Implantable Electronics & Neurodevices worked example

Field Complaint Cost at 1% expected complaint rate: a worked example in implantable electronics & neurodevices

This worked example runs the field complaint cost numbers for a tougher week than the baseline: 1% expected complaint rate instead of the typical 1.2%. Estimate field complaint handling cost for implantable electronics using shipped population, complaint cost, expected rate, and fixed investigation adders.

The inputs for this scenario

  • Shipped devices in complaint scope: 8,000 devices (held at the documented default)
  • Average cost per complaint: 980 $ / complaint (held at the documented default)
  • Expected complaint rate: 1 % (the input this scenario stresses; the baseline uses 1.2)
  • Fixed complaint investigation adders: 28,000 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable field complaint cost = shipped devices in complaint scope × average cost per complaint × expected complaint rate.
  • Total field complaint cost works out to 106,400 $ at these inputs, and this is the headline figure for the scenario.
  • Complaint cost per shipped device works out to 13.3 $ / device at these inputs.
  • Variable field complaint cost works out to 78,400 $ at these inputs.
  • Fixed complaint investigation adders works out to 28,000 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where expected complaint rate sits at 1.2% and the headline result is 122,080 $, this scenario comes in 12.84% below the baseline at 106,400 $.
  • Use it when budgeting complaint-handling and post-market surveillance staffing, or when modeling the cost impact of a change in complaint rate. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total field complaint cost: 106,400 $ (headline result)
  • Complaint cost per shipped device: 13.3 $ / device
  • Variable field complaint cost: 78,400 $
  • Fixed complaint investigation adders: 28,000 $

Run it with your numbers

  • To rerun this with your own numbers, open the live Field Complaint Cost calculator, set expected complaint rate to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.