Industrial Cleaning, Washing & Parts Cleanliness worked example
Ultrasonic Cleaning Time at 21% loading, dwell, and rinse allowance: a worked example
Push loading, dwell, and rinse allowance up to 21% and the picture changes. This example computes every intermediate figure at that operating point. Use it when a process engineer or estimator needs to schedule ultrasonic tank capacity for precision parts.
The inputs for this scenario
- Baskets or fixtures to clean: 36 baskets (unchanged)
- Ultrasonic throughput rate: 0.18 baskets / min (unchanged)
- Loading, dwell, and rinse allowance: 21 % (raised for this scenario; the documented default is 18)
Working through the calculation
- Applying the documented formula (Base ultrasonic cleaning time = baskets or fixtures to clean รท ultrasonic cleaning completion rate) to the inputs above produces each figure below.
- At this operating point the engine returns 242 min for required ultrasonic cleaning time, the number this scenario is built around.
- At this operating point the engine returns 200 min for base ultrasonic cleaning time.
- At this operating point the engine returns 21 % for loading and dwell allowance.
- At this operating point the engine returns 0.18 pieces / min for ultrasonic cleaning completion rate.
How this compares with the baseline
- Against the tool's baseline example, where loading, dwell, and rinse allowance sits at 18% and the headline result is 236 min, this scenario comes in 2.54% above the baseline at 242 min.
- It computes base cleaning time as basket count divided by throughput rate, then inflates it by a loading, dwell, and rinse allowance to give a realistic required time. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Required ultrasonic cleaning time: 242 min (headline result)
- Base ultrasonic cleaning time: 200 min
- Loading and dwell allowance: 21 %
- Ultrasonic cleaning completion rate: 0.18 pieces / min
Run it with your numbers
- Every input above is editable in the live Ultrasonic Cleaning Time calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.