Industrial Cybersecurity & OT Risk worked example
Network Segmentation ROI with segmentation project investment of 120,000 $: a worked example
This worked example runs the network segmentation roi numbers for a tougher week than the baseline: segmentation project investment of 120,000 $ instead of the typical 240,000 $. Estimate payback for OT network segmentation using project investment, annual risk reduction savings, and annual support cost.
The inputs for this scenario
- Segmentation project investment: 120,000 $ (the input this scenario stresses; the baseline uses 240,000)
- Annual risk reduction savings: 95,000 $ / yr (held at the documented default)
- Annual segmentation support cost: 26,000 $ / yr (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Net annual segmentation savings = annual risk reduction savings - annual segmentation support cost.
- Network segmentation payback period works out to 1.74 yr at these inputs, and this is the headline figure for the scenario.
- Net annual segmentation savings works out to 69,000 $ / yr at these inputs.
- Segmentation project investment works out to 120,000 $ at these inputs.
- Five-year net segmentation value works out to 225,000 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where segmentation project investment sits at 240,000 $ and the headline result is 3.48 yr, this scenario comes in 50% below the baseline at 1.74 yr.
- Use it when scoping a segmentation initiative or defending the capital request to finance, before committing to firewall, switch, and architecture spend. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Network segmentation payback period: 1.74 yr (headline result)
- Net annual segmentation savings: 69,000 $ / yr
- Segmentation project investment: 120,000 $
- Five-year net segmentation value: 225,000 $
Run it with your numbers
- To rerun this with your own numbers, open the live Network Segmentation ROI calculator, set segmentation project investment to your actual value, and adjust the remaining inputs to match your operation.