Industrial Training, Documentation & Work Instructions worked example
Training Effectiveness Score with knowledge retention score of 18 score: a worked example
Push knowledge retention score up to 18 score and the picture changes. This example computes every intermediate figure at that operating point. Use this after completing a training program to evaluate its effectiveness using Kirkpatrick-style levels, or when comparing multiple training programs to decide which ones deserve more investment.
The inputs for this scenario
- Knowledge retention score (1-10): 18 score (raised for this scenario; the documented default is 7)
- On-the-job performance score (1-10): 6 score (unchanged)
- Business impact score (1-10): 5 score (unchanged)
Working through the calculation
- Applying the documented formula (Training effectiveness score = knowledge retention x 0.40 + performance improvement x 0.35 + business impact x 0.25) to the inputs above produces each figure below.
- At this operating point the engine returns 10.55 score for training effectiveness score, the number this scenario is built around.
- At this operating point the engine returns 18 score for knowledge retention score.
- At this operating point the engine returns 6 score for on-the-job performance score.
- At this operating point the engine returns 5 score for business impact score.
How this compares with the baseline
- Against the tool's baseline example, where knowledge retention score sits at 7 score and the headline result is 6.15 score, this scenario comes in 71.54% above the baseline at 10.55 score.
- It computes a single weighted effectiveness score (1-10) from retention, on-the-job performance, and business impact ratings. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Training effectiveness score: 10.55 score (headline result)
- Knowledge retention score: 18 score
- On-the-job performance score: 6 score
- Business impact score: 5 score
Run it with your numbers
- Every input above is editable in the live Training Effectiveness Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.