Contract Manufacturing, Job Shop Quoting & Make-to-Order calculator

Job Routing Cost Calculator

Use this calculator to roll routing steps, cost per operation or hour, included scope, and fixed planning/setup adders into a job routing cost.

What this calculator does

  • Estimate cost for the routing operations in a custom job.
  • building costed routings for RFQs, work orders, and make-to-order production plans
  • The result estimates total routing cost for the quoted job scope.

Formula used

  • Variable job routing cost = routing operations or quoted hours × cost per routing operation × routing scope included in quote
  • Total job routing cost = variable job routing cost + fixed routing planning and setup cost

Inputs explained

  • routing operations or quoted hours: Use operation count, setup/run hour blocks, inspection steps, or work-center steps in the quoted routing.
  • cost per routing operation: Include labor, machine time, burden, setup support, inspection, programming, and work-center overhead for each operation.
  • routing scope included in quote: Use 100% for the full routing or less for a subset of operations, alternates, outside steps, or revision-specific work.
  • fixed routing planning and setup cost: Include router creation, NC programming, fixtures, work instructions, travelers, setup sheets, and first-article planning.

How to use the result

  • Use it to compare routings, price operation-heavy jobs, update standards, and explain quote changes to customers.
  • Treat the result as an estimate until the RFQ package, customer drawing revision, material quote, routing, setup standard, shop rate, outside service quote, scrap history, open capacity, due date, and quoted commercial terms are confirmed for the same job, lot size, and customer order.

Common questions

  • What is the job routing cost calculator for? Use this calculator to roll routing steps, cost per operation or hour, included scope, and fixed planning/setup adders into a job routing cost.
  • What information should I enter? Enter routing operations or quoted hours, cost per routing operation, routing scope included in quote, and fixed routing planning and setup cost using the same quote revision, customer order, lot size, routing, and cost basis.
  • What does the result tell me? The result estimates total routing cost for the quoted job scope.
  • When is the result only an estimate? Treat the result as an estimate until the RFQ package, customer drawing revision, material quote, routing, setup standard, shop rate, outside service quote, scrap history, open capacity, due date, and quoted commercial terms are confirmed for the same job, lot size, and customer order.

Last reviewed 2026-05-12.