Lighting, LEDs & Electrical Fixtures worked example
LED Retrofit Payback with total retrofit investment of 45,000 $: a worked example
This scenario runs the led retrofit payback calculation on the strong side: total retrofit investment of 45,000 $, with every other input held at its documented default. Use this when preparing a lighting retrofit proposal, justifying the capital cost of an LED upgrade to facility management or finance, comparing different LED product options by payback, or responding to a customer asking how long before the investment pays for itself.
The inputs for this scenario
- Total retrofit investment: 45,000 $ (raised for this scenario; the documented default is 18,000)
- Annual energy savings: 4,200 $ / yr (unchanged)
- Annual maintenance cost savings: 1,100 $ / yr (unchanged)
Working through the calculation
- Applying the documented formula (Net annual savings = annual energy savings + annual maintenance savings) to the inputs above produces each figure below.
- At this operating point the engine returns 14.52 yr for payback period, the number this scenario is built around.
- At this operating point the engine returns 3,100 $ / yr for net annual savings (energy + maintenance).
- At this operating point the engine returns 45,000 $ for total retrofit investment.
- At this operating point the engine returns -29,500 $ for five year net.
How this compares with the baseline
- Against the tool's baseline example, where total retrofit investment sits at 18,000 $ and the headline result is 5.81 yr, this scenario comes in 150% above the baseline at 14.52 yr.
- Use it to screen a retrofit proposal, compare projects competing for capital, or build the savings case for a rebate application. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Payback period: 14.52 yr (headline result)
- Net annual savings (energy + maintenance): 3,100 $ / yr
- Total retrofit investment: 45,000 $
- Five year net: -29,500 $
Run it with your numbers
- Every input above is editable in the live LED Retrofit Payback calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.