Energy & Sustainability calculator

Lighting Retrofit Payback Calculator

Lighting retrofit payback helps evaluate LED, controls, occupancy sensor, daylighting, or high-bay replacement projects. It compares net annual savings with installed project cost.

What this calculator does

  • Estimate simple payback for a lighting retrofit from project cost, annual electricity savings, and support cost.
  • a facilities manager needs to screen a lighting efficiency project
  • Returns the lighting retrofit payback for the selected facility, line, product, project, or reporting boundary.

Formula used

  • Net annual lighting savings = annual lighting energy and maintenance savings - annual controls or maintenance support cost
  • Lighting retrofit payback = installed lighting retrofit cost รท net annual lighting savings

Inputs explained

  • Installed lighting retrofit cost: Include fixtures, controls, lift rental, labor, disposal, commissioning, and incentives if netted.
  • Annual lighting energy and maintenance savings: Use avoided kWh, demand, lamp replacement, and maintenance savings.
  • Annual controls or maintenance support cost: Include software, sensor maintenance, warranty, or periodic recommissioning cost.

How to use the result

  • Use it for energy management, sustainability reporting, utility-cost review, project screening, compliance planning, or operational performance tracking.
  • It does not replace certified emissions inventories, utility tariff analysis, engineering M&V studies, or regulatory reporting review.

Common questions

  • What does the lighting retrofit payback calculator tell me? It converts the stated energy, carbon, utility, water, waste, or project assumptions into the lighting retrofit payback result shown on the page.
  • Which data should I enter? Use values from utility bills, submeters, emissions-factor tables, production records, supplier data, project estimates, or approved reporting workbooks for the same boundary and period.
  • How should I use the result? Use it to compare projects, support reporting, prioritize audits, update product costing, estimate savings, or prepare a business case before committing resources.
  • When is this only an estimate? Treat it as an estimate until final tariffs, emissions factors, production allocation, metering accuracy, weather or production normalization, and project performance are confirmed.

Last reviewed 2026-05-12.