Machine Vision & Industrial Inspection AI worked example
Machine Vision ROI with total machine vision system investment of 42,500 $: a worked example
This worked example runs the machine vision roi numbers for a tougher week than the baseline: total machine vision system investment of 42,500 $ instead of the typical 85,000 $. Estimate payback period and five-year net value for a machine vision system investment using documented savings from labor reduction, scrap prevention, quality escapes, and rework elimination.
The inputs for this scenario
- Total machine vision system investment: 42,500 $ (the input this scenario stresses; the baseline uses 85,000)
- Annual savings (labor, scrap, escapes, rework): 52,000 $ / yr (held at the documented default)
- Annual system support cost: 6,000 $ / yr (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Net annual savings = annual savings - annual system support cost.
- Machine vision payback period works out to 0.92 yr at these inputs, and this is the headline figure for the scenario.
- Net annual inspection savings works out to 46,000 $ / yr at these inputs.
- Total machine vision investment works out to 42,500 $ at these inputs.
- Five-year net value works out to 187,500 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where total machine vision system investment sits at 85,000 $ and the headline result is 1.85 yr, this scenario comes in 50% below the baseline at 0.92 yr.
- Use it during capital approval for a vision cell, or when comparing build-vs-buy and competing integrator quotes. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Machine vision payback period: 0.92 yr (headline result)
- Net annual inspection savings: 46,000 $ / yr
- Total machine vision investment: 42,500 $
- Five-year net value: 187,500 $
Run it with your numbers
- To rerun this with your own numbers, open the live Machine Vision ROI calculator, set total machine vision system investment to your actual value, and adjust the remaining inputs to match your operation.