Make-Buy, Outsourcing & Network Design worked example
Insourcing Payback with equipment and setup investment to bring work in-house of 62,500 $: a worked example
This scenario runs the insourcing payback calculation on the strong side: equipment and setup investment to bring work in-house of 62,500 $, with every other input held at its documented default. Use it when insourcing payback in make-buy, outsourcing and network design is being put in front of a capital committee and the savings story needs to hold up.
The inputs for this scenario
- Equipment and setup investment to bring work in-house: 62,500 $ (raised for this scenario; the documented default is 25,000)
- Annual savings vs. current outsourced spend: 18,000 $ / yr (unchanged)
- Annual added in-house support and labor cost: 2,500 $ / yr (unchanged)
Working through the calculation
- Applying the documented formula (Net annual insourcing payback savings = annual insourcing payback savings - annual insourcing payback support cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4.03 yr for insourcing payback payback period, the number this scenario is built around.
- At this operating point the engine returns 15,500 $ / yr for net annual insourcing payback savings.
- At this operating point the engine returns 62,500 $ for insourcing payback investment.
- At this operating point the engine returns 15,000 $ for five-year net insourcing payback value.
How this compares with the baseline
- Against the tool's baseline example, where equipment and setup investment to bring work in-house sits at 25,000 $ and the headline result is 1.61 yr, this scenario comes in 150% above the baseline at 4.03 yr.
- Use it when evaluating whether to reshore or in-source a part currently bought from a contract manufacturer, before committing capital to equipment and qualification. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Insourcing payback payback period: 4.03 yr (headline result)
- Net annual insourcing payback savings: 15,500 $ / yr
- Insourcing payback investment: 62,500 $
- Five-year net insourcing payback value: 15,000 $
Run it with your numbers
- Every input above is editable in the live Insourcing Payback calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.