Make-Buy, Outsourcing & Network Design worked example
Production Footprint Comparison at 58% capacity load factor: a worked example
This worked example runs the production footprint comparison numbers for a tougher week than the baseline: 58% capacity load factor instead of the typical 80%. Compare the annual operating cost of a multi-site production footprint including the cost of changing it.
The inputs for this scenario
- Candidate production sites: 3 sites (held at the documented default)
- Annual operating cost per site: 1,850,000 $/site-yr (held at the documented default)
- Capacity load factor: 58 % (the input this scenario stresses; the baseline uses 80)
- Footprint transition cost: 250,000 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Footprint cost = sites x annual cost per site x load factor% + transition cost.
- Total production footprint comparison cost works out to 3,469,000 $ at these inputs, and this is the headline figure for the scenario.
- Production footprint comparison cost per unit works out to 1,156,333 $ / piece at these inputs.
- Variable production footprint comparison cost works out to 3,219,000 $ at these inputs.
- Fixed production footprint comparison adder works out to 250,000 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where capacity load factor sits at 80% and the headline result is 4,690,000 $, this scenario comes in 26.03% below the baseline at 3,469,000 $.
- Use it during a network design or consolidation study to compare the load-adjusted annual cost of competing site configurations. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total production footprint comparison cost: 3,469,000 $ (headline result)
- Production footprint comparison cost per unit: 1,156,333 $ / piece
- Variable production footprint comparison cost: 3,219,000 $
- Fixed production footprint comparison adder: 250,000 $