Make-Buy, Outsourcing & Network Design worked example
Supplier Network Cost at 81% share of suppliers actively managed: a worked example
What does the result look like when share of suppliers actively managed reaches 81%? The full calculation is worked below with real intermediate numbers. A supply-chain manager quantifying the overhead of a sprawling vendor base to justify rationalization.
The inputs for this scenario
- Active suppliers in network: 40 suppliers (unchanged)
- Annual cost to manage each supplier: 6,200 $/supplier-yr (unchanged)
- Share of suppliers actively managed: 81 % (raised for this scenario; the documented default is 70)
- Network platform and audit fees: 35,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Network cost = suppliers x cost per supplier x managed share% + platform and audit fees) to the inputs above produces each figure below.
- At this operating point the engine returns 235,880 $ for total supplier network cost, the number this scenario is built around.
- At this operating point the engine returns 5,897 $ / piece for supplier network cost per unit.
- At this operating point the engine returns 200,880 $ for variable supplier network cost.
- At this operating point the engine returns 35,000 $ for fixed supplier network cost adder.
How this compares with the baseline
- Against the tool's baseline example, where share of suppliers actively managed sits at 70% and the headline result is 208,600 $, this scenario comes in 13.08% above the baseline at 235,880 $.
- A figure at this level is achievable when share of suppliers actively managed is genuinely sustained, not just peaked for a shift. It applies one average management cost to every supplier, so it understates the disproportionate effort that a few high-risk or strategic suppliers actually consume.
Results at a glance
- Total supplier network cost: 235,880 $ (headline result)
- Supplier network cost per unit: 5,897 $ / piece
- Variable supplier network cost: 200,880 $
- Fixed supplier network cost adder: 35,000 $
Run it with your numbers
- Every input above is editable in the live Supplier Network Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.